Successful recycling relies on all collectors following our simple specifications.
Click here to print a one page summary copy of our specifications.
Material acceptance specifications
Any flooring or items that deviates from the above specifications will be considered contamination. If you’re collecting material on site, make sure you keep it separate from other construction waste to avoid contamination.
Collection containers specifications
Collections can take between 4 – 10 days to complete. Timed collections can be organised where necessary.
Contaminants and the problems they cause us
Any contamination makes it harder to produce a quality product and can mean we can’t recycle any of the material in the batch. We may then have to return the material to you or make a charge to cover the cost of transport and landfill.
Blades
Cause a dangerous health and safety risk for hand sorters and can damage machinery which is costly to repair.
Screed and adhesive
Can ruin collection containers and machinery (we can accept uplifted smooth vinyl with up to 3mm of screed or adhesive).
Other flooring types
Can harm the recycling process and reduce the quality of finished product.
Demolition
Waste such as concrete can blunt and damage recycling machinery.
Plastic, polythene & general waste
Gets caught in the machinery and makes the whole batch unusable.
Get In Touch
Call 0161 355 7618 or email info@recofloor.org
